{"id":4746,"date":"2024-02-28T11:21:45","date_gmt":"2024-02-28T19:21:45","guid":{"rendered":"https:\/\/hr.uw.edu\/comp\/?page_id=4746"},"modified":"2025-05-22T14:52:21","modified_gmt":"2025-05-22T21:52:21","slug":"power-plant-electrician-high-voltage","status":"publish","type":"page","link":"https:\/\/v1cypwr8vx2.c.updraftclone.com\/comp\/classified-staff\/power-plant-electrician-high-voltage\/","title":{"rendered":"Power Plant Electrician &#8211; High Voltage"},"content":{"rendered":"<p><strong>UW CODE AND REPRESENTATIVE GROUP<\/strong><\/p>\n<p>18808 (NE S WFSE Trades)<br \/>\n22889 (NE H NI WFSE Trades)<\/p>\n<p><strong>CLASS SERIES CONCEPT<\/strong><\/p>\n<p>Perform operating and maintenance work on the University of Washington electrical distribution system on the Seattle campus.<\/p>\n<p><strong>BASIC FUNCTION<\/strong><\/p>\n<p>At the University of Washington power plant, perform operating and maintenance work on high voltage generation, control, transformation and distribution systems.<\/p>\n<p><strong>DISTINGUISHING CHARACTERISTICS<\/strong><\/p>\n<p>Under general supervision, operate, troubleshoot, install, and repair high voltage electrical generation, control, transformation and distribution systems carrying more than 750 volts up to 26,400 volts.<\/p>\n<p><strong>TYPICAL WORK<\/strong><\/p>\n<p>Troubleshoot, maintain, operate, and repair underground distribution systems, including voltage transformers, switches, circuit breakers, and other related equipment and apparatus;<\/p>\n<p>Monitor and operate current converters, voltage transformers and circuit breakers to control and regulate the flow of electricity; isolate and route electrical currents as necessary for maintenance and repair;<\/p>\n<p>Maintain and keep records of current clearances;<\/p>\n<p>Prepare high voltage systems to be worked on by contractors, including de-energizing high voltage equipment, installing protective grounds, issuing line clearances, and monitoring procedures utilized by contractors;<\/p>\n<p>Splice various types of high voltage multiphase power cable; perform straight splices, joints for branch lines, and fittings for terminal connections;<\/p>\n<p>Install, connect, operate and maintain a variety of electrical equipment including primary power distribution\/transmission cables and equipment, portable engine generators, transformers, and high voltage switches;<\/p>\n<p>Troubleshoot and repair electrical failures relating to high voltage power cables, transformers, breakers, and other equipment;<\/p>\n<p>Troubleshoot, test, calibrate and repair protective relay systems in high voltage substations; prepares and implements test plans;<\/p>\n<p>Maintain and update high voltage electrical distribution system drawings and schematics;<\/p>\n<p>Perform duties in accordance with safety standards and procedures outlined in WAC 296-45;<\/p>\n<p>Perform other duties as required.<\/p>\n<p><strong>MINIMUM QUALIFICATIONS<\/strong><\/p>\n<p>Completion of a recognized apprenticeship as a lineworker or equivalent<\/p>\n<p>AND<\/p>\n<p>Two years working with 2,000 volt or higher electrical equipment at full journey level status.<\/p>\n<p>Equivalent education and\/or experience may substitute for minimum qualifications except when there are legal requirements, such as a license, certification, and\/or registration.<\/p>\n<p>Possession of a valid motor vehicle operator&#8217;s license may be required.<\/p>\n<p><strong>CLASSIFICATION HISTORY<\/strong><\/p>\n<p>01\/03\/1973: New Class<br \/>\n06\/01\/2005: CSR Class Conversion<br \/>\n05\/20\/2016: New Class per MOU with WFSE; Classification specification created from Electrician &#8211; High Voltage (job code: 8830), to reflect power generation and distribution work performed in the Power Plant at the Seattle Campus.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>UW CODE AND REPRESENTATIVE GROUP 18808 (NE S WFSE Trades) 22889 (NE H NI WFSE Trades) CLASS SERIES CONCEPT Perform operating and maintenance work on the University of Washington electrical [&hellip;]<\/p>\n","protected":false},"author":96,"featured_media":0,"parent":12,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_lmt_disableupdate":"no","_lmt_disable":"no","footnotes":""},"class_list":["post-4746","page","type-page","status-publish","format-standard","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/v1cypwr8vx2.c.updraftclone.com\/comp\/wp-json\/wp\/v2\/pages\/4746","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/v1cypwr8vx2.c.updraftclone.com\/comp\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/v1cypwr8vx2.c.updraftclone.com\/comp\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/v1cypwr8vx2.c.updraftclone.com\/comp\/wp-json\/wp\/v2\/users\/96"}],"replies":[{"embeddable":true,"href":"https:\/\/v1cypwr8vx2.c.updraftclone.com\/comp\/wp-json\/wp\/v2\/comments?post=4746"}],"version-history":[{"count":4,"href":"https:\/\/v1cypwr8vx2.c.updraftclone.com\/comp\/wp-json\/wp\/v2\/pages\/4746\/revisions"}],"predecessor-version":[{"id":9515,"href":"https:\/\/v1cypwr8vx2.c.updraftclone.com\/comp\/wp-json\/wp\/v2\/pages\/4746\/revisions\/9515"}],"up":[{"embeddable":true,"href":"https:\/\/v1cypwr8vx2.c.updraftclone.com\/comp\/wp-json\/wp\/v2\/pages\/12"}],"wp:attachment":[{"href":"https:\/\/v1cypwr8vx2.c.updraftclone.com\/comp\/wp-json\/wp\/v2\/media?parent=4746"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}